June 2, 2012, Alpental
6/2/12
WA Snoqualmie Pass
1881
3
Arrived at lot #1 around 1:00pm. Looked like there was a wedding being held in the lodge. Was able to skin ten feet from patio. Snow on Debbie's a bit rutted from snowcats moving electrical equipment in place to power the new mid-mountain building. Rain and wind came and went while climbing, but thankfully slacked off on top, sun tried to peek through a little. Upper Nash entrance still clean. Soft bumps skied well. Adrenaline was soft and smooth. Lower Nash was somewhat cuppy.
Thanks for the update
Also note -- I investigated the Cold Creek road (9070) and found it blocked by a snow drift just past the MIll Creek bridge at 2400ft. I think 4wd pickup truck with 30 inch tires could probably power through, but I didn't even try with my dinky little Honda CRV.
author=Randy link=topic=24980.msg105573#msg105573 date=1338701351]
Also note -- I investigated the Cold Creek road (9070) and found it blocked by a snow drift just past the MIll Creek bridge at 2400ft. I think 4wd pickup truck with 30 inch tires could probably power through, but I didn't even try with my dinky little Honda CRV.
You won't make it much past that
Reply to this TR
Please login first: